Sunday, March 16, 2008

To Kellyville again...

For the last week we have been back and forth with our Allworth consultant regarding prices and changes. On Friday we paid our second deposit to secure $8,000 worth of bonuses including alarm systems, dishwasher and remote control garage.

We went to Kellyville again this weekend to finalised all the changes with our consultant. One thing we didn't like was the design of the kitchen. So instead of a U shape kitchen with a breakfast bar, we have changed it so it is L shaped with an island. I have updated the house design with the new kitchen. This will create a more open feel to the home, plus i can now have a place to make my cocktail mixes...

We also received our colour folder on Saturday - this contains numerous choices of suppliers and colours. I am sure we will be having loads of fun picking the colours for the house. During the next month we will need to visit these suppliers to choose our bricks, roof, tiles and paint colours.

Saturday, March 8, 2008

Tender Recieved!

We received our tender today from Allworth Homes - 1 week longer than expected. The quote was more than what i wanted it to be, but it was the price i expected because of all our added options including bay windows to bed2, building under eves not to mention 9ft ceilings - $6k extra.

Compared to my previous tenders some items cost more and some was less. We will be going back to the Allworth consultant in a few days to see if we can get them to match my previous tender... hopefully we can get a bit off. Some things we also need to clarify next week/changes we have made with the builders is:

  • steps from the back door to backyard included or extra,
  • toilet/bathroom frosted glass included or extra,
  • bay window - they move the whole left side of the house forward 1m but it looks like the bay window was not added to bed2 but rather just cut out of the original size (we will have to look at the actual size of bed2 before and after bay window was added to know exactly),
  • they've charged us for adding walls to make the cinema room but did not consider that we actually removed some other walls, dining and toilet - i questioned them on this and they will get back to me,
  • separate toilet to be included with the bathroom as one,
  • we moved the front entry of the house to the middle,
  • double doors instead of sliding doors to the cinema room,
  • we wanted to increase the width of the kitchen under the eaves but this could not be done, the builder will get back to us.
The original design with Cinema room added and wider kitchen.


The red arrows show changes that we have made to the design.